Legal suite drywall in Edgemont

Edgemont has a mix of 1980s and 1990s homes on large lots. Secondary suite development here often involves converting a basement that was roughed in but never finished. We handle the fire-rated partition, moisture-resistant board in the suite bathroom, and Level 4 finish throughout.

The permit-required drywall scope in Edgemont is consistent with the rest of Calgary: fire-rated Type X board on the party ceiling and wall between the suite and the main dwelling, moisture-resistant board in wet areas, and a Level 4 flat finish throughout. We do not pull permits or do framing — those are separate trades.

Standard secondary suite drywall scope

Area hub: Legal suite drywall NW Calgary — Full overview: Legal suite drywall Calgary

Free quote — legal suite drywall Edgemont

Text or email photos of the framing. We reply same day, 7 days a week.

(403) 829-8702  ·  [email protected]