Secondary suite drywall in Edgemont. Fire-rated party separations, moisture-resistant finishes, Level 4 finish to inspection standard.
Edgemont has a mix of 1980s and 1990s homes on large lots. Secondary suite development here often involves converting a basement that was roughed in but never finished. We handle the fire-rated partition, moisture-resistant board in the suite bathroom, and Level 4 finish throughout.
The permit-required drywall scope in Edgemont is consistent with the rest of Calgary: fire-rated Type X board on the party ceiling and wall between the suite and the main dwelling, moisture-resistant board in wet areas, and a Level 4 flat finish throughout. We do not pull permits or do framing — those are separate trades.
Area hub: Legal suite drywall NW Calgary — Full overview: Legal suite drywall Calgary
Text or email photos of the framing. We reply same day, 7 days a week.